ITAC Assessment: CO0520
ITAC logo
ITAC Assessment: CO0520
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Biopharmaceuticals
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2836: Biological Products, Except Diagnostic Substances
Sales Range greater than $500
M
# of Employees 150
Plant Area 135,000
ft2
Annual Production 2,205
lb
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,373 10,354,308
kWh
Electricity Demand $243,083 17,660
kW-mo/yr
Electricity Fees $204 -
Natural Gas $389,578 73,573
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.3137: Use power during off-peak periods $12,470 $10,000 - $12,470
-
kW-mo/yr
-
02 2.2628: Utilize a less expensive cooling method $10,530 $39,900 $6,230
227,300
kWh
$4,300
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $304 $508 $180
6,584
kWh
$124
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,460 $260 $1,150
41,800
kWh
$790
-
kW-mo/yr
$(-480.0)
05 2.7111: Reduce illumination to minimum necessary levels $410 $260 $240
10,400
kWh
$170
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,174 $50,928 $7,800
286,084
kWh
$17,854
-
kW-mo/yr
$(-480.0)
TOTAL IMPLEMENTED $1,460 $260 $1,150
41,800
kWh
$790
-
kW-mo/yr
$(-480.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs