ITAC Assessment: CO0518
ITAC logo
ITAC Assessment: CO0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Rubber coated electrical connectors
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 550
Plant Area 107,000
ft2
Annual Production 8,400
ton
Production Hrs. Annual 7,488
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $770,456 19,234,800
kWh
Electricity Demand $299,756 31,884
kW-mo/yr
Electricity Fees $73,417 -
Natural Gas $9,041 2,086
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,524 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,144

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $29,120 $30,500 $18,790
475,500
kWh
$7,540
-
kW-mo/yr
- $2,790
02 2.4133: Use most efficient type of electric motors $3,184 $4,668 $2,272
57,486
kWh
$912
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,960 $7,600 $11,330
279,300
kWh
$5,190
-
kW-mo/yr
$(-1,560.0) -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,740 $17,260 $7,740
190,800
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,176 $13,412 $3,162
79,978
kWh
$1,268
-
kW-mo/yr
- $(-254.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,644 $3,886 $2,040
51,596
kWh
$822
-
kW-mo/yr
- $(-1,218.0)
07 2.7111: Reduce illumination to minimum necessary levels $700 $180 $490
12,500
kWh
$210
-
kW-mo/yr
- -
TOTAL RECOMMENDED $61,524 $77,506 $45,824
1,147,160
kWh
$15,942
-
kW-mo/yr
$(-1,560.0) $1,318
TOTAL IMPLEMENTED $18,144 $12,268 $13,602
336,786
kWh
$6,102
-
kW-mo/yr
$(-1,560.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs