Assessment Year | 2002 |
---|---|
Principal Product | Rubber coated electrical connectors |
NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $50 M to 100M |
# of Employees | 550 |
Plant Area |
107,000
ft2
|
Annual Production | 8,400
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | New Mexico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $770,456 | 19,234,800 |
kWh
|
$0.040 |
Electricity Demand | $299,756 | 31,884 |
kW-mo/yr
|
$9.40 |
Electricity Fees | $73,417 | - |
|
- |
Natural Gas | $9,041 | 2,086 |
MMBtu
|
$4.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,524 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,144 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,120 | $30,500 |
$18,790
475,500
kWh
|
$7,540
-
kW-mo/yr
|
- | $2,790 | |
02 | 2.4133: Use most efficient type of electric motors | $3,184 | $4,668 |
$2,272
57,486
kWh
|
$912
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,960 | $7,600 |
$11,330
279,300
kWh
|
$5,190
-
kW-mo/yr
|
$(-1,560.0) | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,740 | $17,260 |
$7,740
190,800
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,176 | $13,412 |
$3,162
79,978
kWh
|
$1,268
-
kW-mo/yr
|
- | $(-254.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,644 | $3,886 |
$2,040
51,596
kWh
|
$822
-
kW-mo/yr
|
- | $(-1,218.0) | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $700 | $180 |
$490
12,500
kWh
|
$210
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $61,524 | $77,506 |
$45,824
1,147,160
kWh
|
$15,942
-
kW-mo/yr
|
$(-1,560.0) | $1,318 | ||
TOTAL IMPLEMENTED | $18,144 | $12,268 |
$13,602
336,786
kWh
|
$6,102
-
kW-mo/yr
|
$(-1,560.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs