ITAC Assessment: CO0517
ITAC logo
ITAC Assessment: CO0517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aerospace electronic components
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 173,400
ft2
Annual Production 2,300
pieces
Production Hrs. Annual 4,420
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,978 3,448,960
kWh
Electricity Demand $33,419 9,518
kW-mo/yr
Electricity Fees $71,004 -
Natural Gas $43,283 10,305
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $26,170 $55,600 n/a $15,760
398,900
kWh
- $10,410
-
MMBtu
-
02 2.3191: Use demand controller or load shedder $3,900 $5,000 - $3,900
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,640 $800 $1,600
35,300
kWh
$560
-
kW-mo/yr
- $(-520.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,290 $2,740 $660
15,000
kWh
$630
-
kW-mo/yr
- -
TOTAL RECOMMENDED $33,000 $64,140 $18,020
449,200
kWh
$5,090
-
kW-mo/yr
$10,410
-
MMBtu
$(-520.0)
TOTAL IMPLEMENTED $2,930 $3,540 $2,260
50,300
kWh
$1,190
-
kW-mo/yr
- $(-520.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs