ITAC Assessment: CO0516
ITAC logo
ITAC Assessment: CO0516
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product gold
NAICS 212221: Gold Ore Mining
SIC 1041: Gold Ores
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 81,650
ft2
Annual Production 24,005
lb
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,689,261 145,937,543
kWh
Electricity Demand $855,399 374,024
kW-mo/yr
Electricity Fees $530,111 -
LPG $1,462,812 271,468
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $783,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $103,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Administrative Changes Savings
01 2.9121: Install wind powered electric generator $616,200 $4,800,000 $558,500
8,760,000
kWh
- - $(-100,000.0) $157,700
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $90,030 $21,080 $83,910
1,316,000
kWh
$6,900
-
kW-mo/yr
- $(-780.0) -
03 2.1116: Improve combustion control capability $44,200 $30,000 n/a - - $44,200
-
MMBtu
- -
04 2.4239: Eliminate or reduce compressed air usage $19,300 $38,900 $17,830
279,700
kWh
$1,470
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $9,370 $2,480 $8,660
135,800
kWh
$710
-
kW-mo/yr
- - -
06 2.2511: Insulate bare equipment $4,380 $900 - - $4,380
-
MMBtu
- -
TOTAL RECOMMENDED $783,480 $4,893,360 $668,900
10,491,500
kWh
$9,080
-
kW-mo/yr
$48,580
-
MMBtu
$(-100,780.0) $157,700
TOTAL IMPLEMENTED $103,780 $24,460 $92,570
1,451,800
kWh
$7,610
-
kW-mo/yr
$4,380
-
MMBtu
$(-780.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs