Assessment Year | 2002 |
---|---|
Principal Product | gold |
NAICS | 212221: Gold Ore Mining |
SIC | 1041: Gold Ores |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
81,650
ft2
|
Annual Production | 24,005
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $8,689,261 | 145,937,543 |
kWh
|
$0.060 |
Electricity Demand | $855,399 | 374,024 |
kW-mo/yr
|
$2.29 |
Electricity Fees | $530,111 | - |
|
- |
LPG | $1,462,812 | 271,468 |
MMBtu
|
$5.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $783,480 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $103,780 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.9121: Install wind powered electric generator | $616,200 | $4,800,000 |
$558,500
8,760,000
kWh
|
- | - | $(-100,000.0) | $157,700 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $90,030 | $21,080 |
$83,910
1,316,000
kWh
|
$6,900
-
kW-mo/yr
|
- | $(-780.0) | - | |
03 | 2.1116: Improve combustion control capability | $44,200 | $30,000 | n/a | - | - |
$44,200
-
MMBtu
|
- | - |
04 | 2.4239: Eliminate or reduce compressed air usage | $19,300 | $38,900 |
$17,830
279,700
kWh
|
$1,470
-
kW-mo/yr
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $9,370 | $2,480 |
$8,660
135,800
kWh
|
$710
-
kW-mo/yr
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $4,380 | $900 | - | - |
$4,380
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $783,480 | $4,893,360 |
$668,900
10,491,500
kWh
|
$9,080
-
kW-mo/yr
|
$48,580
-
MMBtu
|
$(-100,780.0) | $157,700 | ||
TOTAL IMPLEMENTED | $103,780 | $24,460 |
$92,570
1,451,800
kWh
|
$7,610
-
kW-mo/yr
|
$4,380
-
MMBtu
|
$(-780.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs