Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Powdered metal oxides
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 120,000
ft2
Annual Production 38,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $310,399 7,834,391
kWh
Electricity Demand $78,691 14,604
kW-mo/yr
Electricity Fees $108 -
Natural Gas $309,326 84,480
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $310,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,716

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Increase in Production Savings
01 2.2511: Insulate bare equipment $20,150 $7,050 - - $20,150
-
MMBtu
- -
02 2.4239: Eliminate or reduce compressed air usage $8,930 $2,500 $7,450
199,700
kWh
$1,480
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,440 $12,820 $4,780
128,100
kWh
$1,140
-
kW-mo/yr
- $(-480.0) -
04 2.4239: Eliminate or reduce compressed air usage $5,100 $3,480 $4,260
114,100
kWh
$840
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,340 $240 $3,440
92,100
kWh
$680
-
kW-mo/yr
- $(-780.0) -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,370 $3,860 $1,980
53,100
kWh
$390
-
kW-mo/yr
- - -
07 2.4133: Use most efficient type of electric motors $446 $434 $372
9,979
kWh
$74
-
kW-mo/yr
- - -
08 4.111: Add equipment/ operators to reduce production bottleneck $264,970 $175,000 n/a $7,640
204,800
kWh
$480
-
kW-mo/yr
- - $256,850
TOTAL RECOMMENDED $310,746 $205,384 $29,922
801,879
kWh
$5,084
-
kW-mo/yr
$20,150
-
MMBtu
$(-1,260.0) $256,850
TOTAL IMPLEMENTED $12,716 $3,174 $11,262
301,779
kWh
$2,234
-
kW-mo/yr
- $(-780.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Increase in Production Savings