Assessment Year | 2002 |
---|---|
Principal Product | Metal lockers |
NAICS |
n/a
|
SIC | 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
110,000
ft2
|
Annual Production | 17,000
pieces
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,925 | 1,857,100 |
kWh
|
$0.049 |
Electricity Demand | $52,973 | 6,167 |
kW-mo/yr
|
$8.59 |
Natural Gas | $24,643 | 2,525 |
MMBtu
|
$9.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,267 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,787 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,940 | $68,900 |
$10,930
221,100
kWh
|
$5,010
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,120 | $15,380 |
$7,590
153,600
kWh
|
$2,530
-
kW-mo/yr
|
- | |
03 | 2.3191: Use demand controller or load shedder | $5,150 | $7,000 | - |
$5,150
-
kW-mo/yr
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $817 | $1,358 |
$608
12,287
kWh
|
$209
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,700 | $330 |
$2,100
42,400
kWh
|
$960
-
kW-mo/yr
|
$(-360.0) | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,540 | $160 |
$1,730
35,100
kWh
|
$860
-
kW-mo/yr
|
$(-50.0) | |
TOTAL RECOMMENDED | $37,267 | $93,128 |
$22,958
464,487
kWh
|
$14,719
-
kW-mo/yr
|
$(-410.0) | ||
TOTAL IMPLEMENTED | $18,787 | $24,068 |
$10,298
208,287
kWh
|
$8,849
-
kW-mo/yr
|
$(-360.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs