ITAC Assessment: CO0505
ITAC logo
ITAC Assessment: CO0505
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Galvanized steel parts
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 30,900
ft2
Annual Production 8,400
ton
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,397 505,920
kWh
Electricity Demand $12,209 907
kW-mo/yr
Electricity Fees $193 -
Natural Gas $124,168 25,302
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,510

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2514: Cover open tanks $18,110 $30,000 - - $18,110
-
MMBtu
-
02 2.2514: Cover open tanks $11,730 $15,600 - - $11,730
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $3,940 $5,400 $1,600
93,100
kWh
$2,340
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,800 $600 $1,280
74,500
kWh
$1,880
-
kW-mo/yr
- $(-360.0)
05 2.2136: Install / repair insulation on steam lines $2,400 $1,680 - - $2,400
-
MMBtu
-
06 2.2515: Use optimum thickness insulation $1,260 $2,500 - - $1,260
-
MMBtu
-
07 2.7132: Install timers on light switches in little used areas $770 $60 $340
20,000
kWh
$430
-
kW-mo/yr
- -
TOTAL RECOMMENDED $41,010 $55,840 $3,220
187,600
kWh
$4,650
-
kW-mo/yr
$33,500
-
MMBtu
$(-360.0)
TOTAL IMPLEMENTED $7,510 $6,060 $3,220
187,600
kWh
$4,650
-
kW-mo/yr
- $(-360.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs