| Assessment Year | 2002 |
|---|---|
| Principal Product | Galvanized steel parts |
| NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 30 |
| Plant Area |
30,900
ft2
|
| Annual Production | 8,400
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $8,397 | 505,920 |
kWh
|
$0.017 |
| Electricity Demand | $12,209 | 907 |
kW-mo/yr
|
$13.46 |
| Electricity Fees | $193 | - |
|
- |
| Natural Gas | $124,168 | 25,302 |
MMBtu
|
$4.91 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $41,010 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,510 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2514: Cover open tanks | $18,110 | $30,000 | - | - |
$18,110
-
MMBtu
|
- | |
| 02 | 2.2514: Cover open tanks | $11,730 | $15,600 | - | - |
$11,730
-
MMBtu
|
- | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $3,940 | $5,400 |
$1,600
93,100
kWh
|
$2,340
-
kW-mo/yr
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,800 | $600 |
$1,280
74,500
kWh
|
$1,880
-
kW-mo/yr
|
- | $(-360.0) | |
| 05 | 2.2136: Install / repair insulation on steam lines | $2,400 | $1,680 | - | - |
$2,400
-
MMBtu
|
- | |
| 06 | 2.2515: Use optimum thickness insulation | $1,260 | $2,500 | - | - |
$1,260
-
MMBtu
|
- | |
| 07 | 2.7132: Install timers on light switches in little used areas | $770 | $60 |
$340
20,000
kWh
|
$430
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $41,010 | $55,840 |
$3,220
187,600
kWh
|
$4,650
-
kW-mo/yr
|
$33,500
-
MMBtu
|
$(-360.0) | ||
| TOTAL IMPLEMENTED | $7,510 | $6,060 |
$3,220
187,600
kWh
|
$4,650
-
kW-mo/yr
|
- | $(-360.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs