Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product aerospace hardware
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 162,000
ft2
Annual Production 304,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,357 16,700,444
kWh
Electricity Demand $382,855 58,158
kW-mo/yr
Electricity Fees $1,509 -
Natural Gas $233,887 39,190
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $192,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,890 $12,000 - $18,890
-
kW-mo/yr
- - - -
02 2.2511: Insulate bare equipment $11,610 $1,980 $5,490
347,700
kWh
$6,120
-
kW-mo/yr
- - - -
03 2.6218: Turn off equipment when not in use $9,180 $10,000 $5,540
351,700
kWh
$3,640
-
kW-mo/yr
- - - -
04 2.6218: Turn off equipment when not in use $5,020 $2,000 $2,370
150,400
kWh
$2,650
-
kW-mo/yr
- - - -
05 2.6218: Turn off equipment when not in use $3,440 $2,000 $3,440
218,100
kWh
- - - - -
06 2.6241: Reduce temperature of process equipment when on standby $2,900 - $1,230
77,900
kWh
$1,670
-
kW-mo/yr
- - - -
07 2.6218: Turn off equipment when not in use $620 $500 $310
19,800
kWh
$310
-
kW-mo/yr
- - - -
08 3.3128: Utilize other methods to remove contaminants $137,140 $300,000 - - - $15,000
-
lb
$112,320 $9,820
09 3.5248: Separate and recycle scrap metal to foundry or for sale $3,230 $6,500 - - $3,230
-
gal
- - -
TOTAL RECOMMENDED $192,030 $334,980 $18,380
1,165,600
kWh
$33,280
-
kW-mo/yr
$3,230
-
gal
$15,000
-
lb
$112,320 $9,820
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs