ITAC Assessment: CO0496
ITAC logo
ITAC Assessment: CO0496
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product metal furniture
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $10
M
to 50
M
# of Employees 149
Plant Area 90,000
ft2
Annual Production 800,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,711 2,958,785
kWh
Electricity Demand $82,073 6,281
kW-mo/yr
Electricity Fees $192 -
Natural Gas $114,980 19,471
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $197,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $8,120 $12,000 - $8,120
-
kW-mo/yr
- - - - -
02 2.2437: Recover waste heat from equipment $2,560 $5,260 - - $2,560
-
MMBtu
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,240 $220 $960
59,500
kWh
$1,060
-
kW-mo/yr
- - $(-780.0) - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $190 - $1,160
72,100
kWh
$2,780
-
kW-mo/yr
- - $(-1,530.0) - $(-2,220.0)
05 3.1191: Change procedures / equipment / operating conditions $104,330 $20,000 - - - $330
-
lb
- - $104,000
06 3.5313: Increase amount of waste recovered for resale $68,550 $3,360 - - - $310
-
lb
- - $68,240
07 4.322: Eliminate old stock and modify inventory control $12,610 - - - - - - $12,610 -
TOTAL RECOMMENDED $197,600 $40,840 $2,120
131,600
kWh
$11,960
-
kW-mo/yr
$2,560
-
MMBtu
$640
-
lb
$(-2,310.0) $12,610 $170,020
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs