ITAC Assessment: CO0494
ITAC logo
ITAC Assessment: CO0494
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product corrugated cardboard containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 1,230
Plant Area 223,200
ft2
Annual Production 825,500
thousand feet
Production Hrs. Annual 5,460
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,028 6,253,240
kWh
Electricity Demand $170,889 13,194
kW-mo/yr
Electricity Fees $1,521 -
Natural Gas $344,446 59,117
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $17,000 $12,000 - $17,000
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,820 $250 $3,070
200,000
kWh
$3,530
-
kW-mo/yr
- $(-780.0) -
03 2.2437: Recover waste heat from equipment $1,090 $800 - - $1,090
-
MMBtu
- -
04 2.4133: Use most efficient type of electric motors $80 $199 $28
1,840
kWh
$52
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $380 - $1,000
65,000
kWh
$1,610
-
kW-mo/yr
- $(-960.0) $(-1,270.0)
TOTAL RECOMMENDED $24,370 $13,249 $4,098
266,840
kWh
$22,192
-
kW-mo/yr
$1,090
-
MMBtu
$(-1,740.0) $(-1,270.0)
TOTAL IMPLEMENTED $6,280 $449 $4,098
266,840
kWh
$5,192
-
kW-mo/yr
- $(-1,740.0) $(-1,270.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs