| Assessment Year | 2001 |
|---|---|
| Principal Product | corrugated cardboard containers |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 1,230 |
| Plant Area |
223,200
ft2
|
| Annual Production | 825,500
thousand feet
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $96,028 | 6,253,240 |
kWh
|
$0.015 |
| Electricity Demand | $170,889 | 13,194 |
kW-mo/yr
|
$12.95 |
| Electricity Fees | $1,521 | - |
|
- |
| Natural Gas | $344,446 | 59,117 |
MMBtu
|
$5.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,280 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3191: Use demand controller or load shedder | $17,000 | $12,000 | - |
$17,000
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,820 | $250 |
$3,070
200,000
kWh
|
$3,530
-
kW-mo/yr
|
- | $(-780.0) | - | |
| 03 | 2.2437: Recover waste heat from equipment | $1,090 | $800 | - | - |
$1,090
-
MMBtu
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $80 | $199 |
$28
1,840
kWh
|
$52
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $380 | - |
$1,000
65,000
kWh
|
$1,610
-
kW-mo/yr
|
- | $(-960.0) | $(-1,270.0) | |
| TOTAL RECOMMENDED | $24,370 | $13,249 |
$4,098
266,840
kWh
|
$22,192
-
kW-mo/yr
|
$1,090
-
MMBtu
|
$(-1,740.0) | $(-1,270.0) | ||
| TOTAL IMPLEMENTED | $6,280 | $449 |
$4,098
266,840
kWh
|
$5,192
-
kW-mo/yr
|
- | $(-1,740.0) | $(-1,270.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs