Assessment Year | 2001 |
---|---|
Principal Product | precision sheet metal components |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
125,000
ft2
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $84,443 | 2,561,400 |
kWh
|
$0.033 |
Electricity Demand | $69,154 | 15,278 |
kW-mo/yr
|
$4.53 |
Electricity Fees | $4,368 | - |
|
- |
Natural Gas | $87,503 | 15,372 |
MMBtu
|
$5.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,590 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,210 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $11,370 | $13,000 | - |
$11,370
-
kW-mo/yr
|
- | - | - | |
02 | 2.3191: Use demand controller or load shedder | $5,240 | $18,000 | - |
$5,240
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,950 | $470 |
$3,320
71,200
kWh
|
$1,410
-
kW-mo/yr
|
- | $(-780.0) | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,350 | $60 |
$950
20,400
kWh
|
$400
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $260 | - |
$1,030
22,400
kWh
|
$420
-
kW-mo/yr
|
- | $(-190.0) | $(-1,000.0) | |
06 | 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner | $1,420 | $1,150 | - | - |
$140
-
gal
|
$690 | $590 | |
TOTAL RECOMMENDED | $23,590 | $32,680 |
$5,300
114,000
kWh
|
$18,840
-
kW-mo/yr
|
$140
-
gal
|
$(-280.0) | $(-410.0) | ||
TOTAL IMPLEMENTED | $4,210 | $470 |
$4,350
93,600
kWh
|
$1,830
-
kW-mo/yr
|
- | $(-970.0) | $(-1,000.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs