ITAC Assessment: CO0486
ITAC logo
ITAC Assessment: CO0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product refined petroleum products
NAICS
n/a
SIC 2911: Petroleum Refining
Sales Range $100
M
to 500
M
# of Employees 218
Plant Area 3,920,000
ft2
Annual Production 17,600,000
bbl
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,013,947 99,597,600
kWh
Electricity Demand $981,835 171,087
kW-mo/yr
Electricity Fees $1,210 -
Natural Gas $2,822,095 634,925
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $441,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $298,800 $962,500 $(-151,500.0)
(-6,937,000)
kWh
$(-58,700.0)
-
kW-mo/yr
$434,000
-
MMBtu
$75,000
02 2.1233: Analyze flue gas for proper air/fuel ratio $105,800 $28,000 n/a - - $105,800
-
MMBtu
-
03 2.3212: Optimize plant power factor $22,640 $68,400 - $22,640
-
kW-mo/yr
- -
04 2.4234: Cool compressor air intake with heat exchanger $7,590 $10,000 - - $7,590
-
MMBtu
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,140 $21,600 n/a $4,140
189,600
kWh
- - -
06 2.2511: Insulate bare equipment $2,490 $6,000 - - $2,490
-
MMBtu
-
TOTAL RECOMMENDED $441,460 $1,096,500 $(-147,360.0)
(-6,747,400)
kWh
$(-36,060.0)
-
kW-mo/yr
$549,880
-
MMBtu
$75,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs