Assessment Year | 2001 |
---|---|
Principal Product | railroad frogs and switches |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
91,300
ft2
|
Annual Production | 500
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Wyoming |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $37,467 | 1,652,240 |
kWh
|
$0.023 |
Electricity Demand | $38,249 | 3,714 |
kW-mo/yr
|
$10.30 |
Electricity Fees | $324 | - |
|
- |
Natural Gas | $79,010 | 13,155 |
MMBtu
|
$6.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,930 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $8,050 | $8,660 | n/a |
$(-140.0)
(-6,300)
kWh
|
$(-90.0)
-
kW-mo/yr
|
$8,280
-
MMBtu
|
- | - |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $7,440 | $1,670 | n/a | - | - |
$7,440
-
MMBtu
|
- | - |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,610 | $390 | n/a |
$2,740
119,900
kWh
|
$2,230
-
kW-mo/yr
|
- | $(-360.0) | - |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,010 | $4,000 | n/a | - |
$4,010
-
kW-mo/yr
|
- | - | - |
05 | 2.9111: Use solar heat to heat make-up air | $2,110 | $12,600 | n/a |
$(-50.0)
(-2,100)
kWh
|
$(-110.0)
-
kW-mo/yr
|
$2,270
-
MMBtu
|
- | - |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $870 | $30 | n/a | - |
$330
-
kW-mo/yr
|
$540
-
MMBtu
|
- | - |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $520 | - | n/a |
$480
21,000
kWh
|
$350
-
kW-mo/yr
|
- | $(-80.0) | $(-230.0) |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $34,130 | $7,350 | n/a | - | - | - | $34,130 | - |
09 | 4.122: Develop standard procedures to improve internal yields | $14,950 | - | n/a | - | - | - | $14,950 | - |
10 | 4.132: Purchase new equipment to reduce material use / cost | $11,240 | $20,000 | n/a | - | - | - | $6,240 | $5,000 |
TOTAL RECOMMENDED | $87,930 | $54,700 |
$3,030
132,500
kWh
|
$6,720
-
kW-mo/yr
|
$18,530
-
MMBtu
|
$54,880 | $4,770 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs