Assessment Year | 2001 |
---|---|
Principal Product | gears |
NAICS |
n/a
|
SIC | 3462: Iron and Steel Forgings |
Sales Range | $1 M to 5M |
# of Employees | 17 |
Plant Area |
28,800
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $27,775 | 911,800 |
kWh
|
$0.030 |
Electricity Demand | $18,161 | 1,936 |
kW-mo/yr
|
$9.38 |
Electricity Fees | $120 | - |
|
- |
Natural Gas | $13,697 | 2,428 |
MMBtu
|
$5.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,670 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,400 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $5,120 | $10,000 | - | - |
$5,120
-
MMBtu
|
- | - | - | - | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $1,800 | $700 | - | - |
$1,800
-
MMBtu
|
- | - | - | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,100 | $210 |
$790
26,000
kWh
|
$670
-
kW-mo/yr
|
- | - | - | - | $(-360.0) | - | - | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $990 | $370 |
$160
5,200
kWh
|
- |
$830
-
MMBtu
|
- | - | - | - | - | - | - | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $900 | $1,500 | - |
$900
-
kW-mo/yr
|
- | - | - | - | - | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $310 | $60 |
$170
5,500
kWh
|
$140
-
kW-mo/yr
|
- | - | - | - | - | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $190 | - |
$160
5,300
kWh
|
$110
-
kW-mo/yr
|
- | - | - | - | - | - | $(-80.0) | - | |
08 | 3.7112: Use squeegees, mops, and vacuums for floor cleaning | $16,420 | $730 | - | - | - | - |
$(-1,440.0)
-
gal
|
$14,960
-
lb
|
$(-860.0) | - | $3,760 | - | |
09 | 3.8132: Use less toxic and volatile solvent substitutes | $730 | $2,000 |
$(-80.0)
2,600
kWh
|
$(-40.0)
-
kW-mo/yr
|
- | - |
$1,490
-
gal
|
- | - | - | $(-640.0) | - | |
10 | 4.631: Install an uninteruptable power supply | $64,110 | $75,000 | - | - | - |
$(-12,320.0)
-
MMBtu
|
- | - | - | $20,430 | - | $56,000 | |
TOTAL RECOMMENDED | $91,670 | $90,570 |
$1,200
44,600
kWh
|
$1,780
-
kW-mo/yr
|
$7,750
-
MMBtu
|
$(-12,320.0)
-
MMBtu
|
$50
-
gal
|
$14,960
-
lb
|
$(-1,220.0) | $20,430 | $3,040 | $56,000 | ||
TOTAL IMPLEMENTED | $2,400 | $640 |
$1,120
36,700
kWh
|
$810
-
kW-mo/yr
|
$830
-
MMBtu
|
- | - | - | $(-360.0) | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs