| Assessment Year | 2000 |
|---|---|
| Principal Product | air handling equip & fab metal parts |
| NAICS |
n/a
|
| SIC | 3444: Sheet Metal Work |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
104,000
ft2
|
| Annual Production | 1,000
ton
|
| Production Hrs. Annual | 2,184
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $8,887 | 513,189 |
kWh
|
$0.017 |
| Electricity Demand | $33,236 | 2,442 |
kW-mo/yr
|
$13.61 |
| Electricity Fees | $202 | - |
|
- |
| Natural Gas | $10,279 | 2,226 |
MMBtu
|
$4.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $190,830 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,590 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,970 | $17,900 | n/a |
$720
44,549
kWh
|
$3,250
-
kW-mo/yr
|
- | - | - |
| 02 | 2.3191: Use demand controller or load shedder | $3,190 | $2,500 | - |
$3,190
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $3,180 | $12,990 |
$(-100.0)
(-6,448)
kWh
|
$(-120.0)
-
kW-mo/yr
|
$3,400
-
MMBtu
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $400 | $110 |
$140
8,499
kWh
|
$620
-
kW-mo/yr
|
- | $(-360.0) | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $390 | $60 |
$70
4,396
kWh
|
$320
-
kW-mo/yr
|
- | - | - | |
| 06 | 4.111: Add equipment/ operators to reduce production bottleneck | $179,700 | - | - | - | - | $(-69,900.0) | $249,600 | |
| TOTAL RECOMMENDED | $190,830 | $33,560 |
$830
50,996
kWh
|
$7,260
-
kW-mo/yr
|
$3,400
-
MMBtu
|
$(-70,260.0) | $249,600 | ||
| TOTAL IMPLEMENTED | $3,590 | $2,610 |
$140
8,499
kWh
|
$3,810
-
kW-mo/yr
|
- | $(-360.0) | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs