ITAC Assessment: CO0479
ITAC logo
ITAC Assessment: CO0479
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product air handling equip & fab metal parts
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 104,000
ft2
Annual Production 1,000
ton
Production Hrs. Annual 2,184
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,887 513,189
kWh
Electricity Demand $33,236 2,442
kW-mo/yr
Electricity Fees $202 -
Natural Gas $10,279 2,226
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $190,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,970 $17,900 n/a $720
44,549
kWh
$3,250
-
kW-mo/yr
- - -
02 2.3191: Use demand controller or load shedder $3,190 $2,500 - $3,190
-
kW-mo/yr
- - -
03 2.7243: Improve air circulation with destratification fans / other methods $3,180 $12,990 $(-100.0)
(-6,448)
kWh
$(-120.0)
-
kW-mo/yr
$3,400
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $400 $110 $140
8,499
kWh
$620
-
kW-mo/yr
- $(-360.0) -
05 2.4231: Reduce the pressure of compressed air to the minimum required $390 $60 $70
4,396
kWh
$320
-
kW-mo/yr
- - -
06 4.111: Add equipment/ operators to reduce production bottleneck $179,700 - - - - $(-69,900.0) $249,600
TOTAL RECOMMENDED $190,830 $33,560 $830
50,996
kWh
$7,260
-
kW-mo/yr
$3,400
-
MMBtu
$(-70,260.0) $249,600
TOTAL IMPLEMENTED $3,590 $2,610 $140
8,499
kWh
$3,810
-
kW-mo/yr
- $(-360.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs