Assessment Year | 2000 |
---|---|
Principal Product | metal and plastic carts and hand trucks |
NAICS |
n/a
|
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $5 M to 10M |
# of Employees | 70 |
Plant Area |
54,000
ft2
|
Annual Production | 156,000
pieces
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $23,058 | 652,110 |
kWh
|
$0.035 |
Electricity Demand | $20,610 | 4,315 |
kW-mo/yr
|
$4.78 |
Electricity Fees | $(-1,010.0) | - |
|
- |
Natural Gas | $44,285 | 10,268 |
MMBtu
|
$4.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,080 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,360 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $3,180 | $4,580 |
$(-110.0)
(-2,052)
kWh
|
- |
$3,290
-
MMBtu
|
- | - | - | - | |
02 | 2.3212: Optimize plant power factor | $3,330 | $5,470 | - |
$3,330
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.3191: Use demand controller or load shedder | $1,100 | $6,000 | - |
$1,100
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $300 | $490 |
$580
13,482
kWh
|
$500
-
kW-mo/yr
|
- | - | $(-780.0) | - | - | |
05 | 3.5316: Contract a wood pallet recycling company | $1,430 | - | - | - | - |
$1,430
-
lb
|
- | - | - | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $34,630 | $100,000 |
$1,350
31,360
kWh
|
$1,580
-
kW-mo/yr
|
$15,320
-
MMBtu
|
- | $16,380 | - | - | |
07 | 4.444: Install system to collect scrap | $14,590 | $45,000 | - | - | - | - | - | $14,590 | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $6,520 | $20,000 | - | - | - | - | - | - | $6,520 | |
TOTAL RECOMMENDED | $65,080 | $181,540 |
$1,820
42,790
kWh
|
$6,510
-
kW-mo/yr
|
$18,610
-
MMBtu
|
$1,430
-
lb
|
$15,600 | $14,590 | $6,520 | ||
TOTAL IMPLEMENTED | $36,360 | $100,490 |
$1,930
44,842
kWh
|
$2,080
-
kW-mo/yr
|
$15,320
-
MMBtu
|
$1,430
-
lb
|
$15,600 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs