ITAC Assessment: CO0475
ITAC logo
ITAC Assessment: CO0475
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product metal and plastic carts and hand trucks
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 54,000
ft2
Annual Production 156,000
pieces
Production Hrs. Annual 2,470
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,058 652,110
kWh
Electricity Demand $20,610 4,315
kW-mo/yr
Electricity Fees $(-1,010.0) -
Natural Gas $44,285 10,268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7243: Improve air circulation with destratification fans / other methods $3,180 $4,580 $(-110.0)
(-2,052)
kWh
- $3,290
-
MMBtu
- - - -
02 2.3212: Optimize plant power factor $3,330 $5,470 - $3,330
-
kW-mo/yr
- - - - -
03 2.3191: Use demand controller or load shedder $1,100 $6,000 - $1,100
-
kW-mo/yr
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $300 $490 $580
13,482
kWh
$500
-
kW-mo/yr
- - $(-780.0) - -
05 3.5316: Contract a wood pallet recycling company $1,430 - - - - $1,430
-
lb
- - -
06 4.111: Add equipment/ operators to reduce production bottleneck $34,630 $100,000 $1,350
31,360
kWh
$1,580
-
kW-mo/yr
$15,320
-
MMBtu
- $16,380 - -
07 4.444: Install system to collect scrap $14,590 $45,000 - - - - - $14,590 -
08 4.111: Add equipment/ operators to reduce production bottleneck $6,520 $20,000 - - - - - - $6,520
TOTAL RECOMMENDED $65,080 $181,540 $1,820
42,790
kWh
$6,510
-
kW-mo/yr
$18,610
-
MMBtu
$1,430
-
lb
$15,600 $14,590 $6,520
TOTAL IMPLEMENTED $36,360 $100,490 $1,930
44,842
kWh
$2,080
-
kW-mo/yr
$15,320
-
MMBtu
$1,430
-
lb
$15,600 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs