| Assessment Year | 2000 |
|---|---|
| Principal Product | structural and architectural steel |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $50 M to 100M |
| # of Employees | 75 |
| Plant Area |
135,000
ft2
|
| Annual Production | 12,000
ton
|
| Production Hrs. Annual | 4,810
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $27,501 | 1,642,732 |
kWh
|
$0.017 |
| Electricity Demand | $79,294 | 6,067 |
kW-mo/yr
|
$13.07 |
| Electricity Fees | $384 | - |
|
- |
| Natural Gas | $43,328 | 8,773 |
MMBtu
|
$4.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $345,340 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $340,880 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3191: Use demand controller or load shedder | $8,930 | $10,000 | - |
$8,930
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,680 | $560 |
$1,170
71,219
kWh
|
$2,290
-
kW-mo/yr
|
- | $(-780.0) | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $2,060 | $2,250 | - | - |
$2,060
-
MMBtu
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $70 | - |
$10
586
kWh
|
$40
-
kW-mo/yr
|
- | - | $20 | - | |
| 05 | 4.111: Add equipment/ operators to reduce production bottleneck | $329,200 | $60,000 | - | - | - | - | - | $329,200 | |
| 06 | 4.222: Purchase re-conditioned material instead of new | $2,400 | - | - | - | - | $(-1,200.0) | $3,600 | - | |
| TOTAL RECOMMENDED | $345,340 | $72,810 |
$1,180
71,805
kWh
|
$11,260
-
kW-mo/yr
|
$2,060
-
MMBtu
|
$(-1,980.0) | $3,620 | $329,200 | ||
| TOTAL IMPLEMENTED | $340,880 | $70,560 |
$1,180
71,805
kWh
|
$11,260
-
kW-mo/yr
|
- | $(-780.0) | $20 | $329,200 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs