ITAC Assessment: CO0474
ITAC logo
ITAC Assessment: CO0474
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product structural and architectural steel
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 135,000
ft2
Annual Production 12,000
ton
Production Hrs. Annual 4,810
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,501 1,642,732
kWh
Electricity Demand $79,294 6,067
kW-mo/yr
Electricity Fees $384 -
Natural Gas $43,328 8,773
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $345,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $340,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.3191: Use demand controller or load shedder $8,930 $10,000 - $8,930
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,680 $560 $1,170
71,219
kWh
$2,290
-
kW-mo/yr
- $(-780.0) - -
03 2.2437: Recover waste heat from equipment $2,060 $2,250 - - $2,060
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $70 - $10
586
kWh
$40
-
kW-mo/yr
- - $20 -
05 4.111: Add equipment/ operators to reduce production bottleneck $329,200 $60,000 - - - - - $329,200
06 4.222: Purchase re-conditioned material instead of new $2,400 - - - - $(-1,200.0) $3,600 -
TOTAL RECOMMENDED $345,340 $72,810 $1,180
71,805
kWh
$11,260
-
kW-mo/yr
$2,060
-
MMBtu
$(-1,980.0) $3,620 $329,200
TOTAL IMPLEMENTED $340,880 $70,560 $1,180
71,805
kWh
$11,260
-
kW-mo/yr
- $(-780.0) $20 $329,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings