Assessment Year | 2000 |
---|---|
Principal Product | aluminum extruded products |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
350,000
ft2
|
Annual Production | 82,400,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $466,706 | 21,188,453 |
kWh
|
$0.022 |
Electricity Demand | $363,716 | 34,313 |
kW-mo/yr
|
$10.60 |
Electricity Fees | $2,433 | - |
|
- |
Natural Gas | $1,049,642 | 322,586 |
MMBtu
|
$3.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $842,760 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $244,960 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $74,960 | $1,050 | - | - |
$74,960
-
MMBtu
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,150 | $400 |
$3,710
168,230
kWh
|
$2,440
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.3191: Use demand controller or load shedder | $6,360 | $10,000 | - |
$6,360
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,980 | $1,000 |
$3,790
172,040
kWh
|
$2,490
-
kW-mo/yr
|
- | - | $(-1,300.0) | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $4,180 | $6,780 |
$2,520
114,302
kWh
|
$1,660
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.2531: Re-size charging openings or add movable cover or door | $1,260 | $500 | - | - |
$1,260
-
MMBtu
|
- | - | - | - | |
07 | 3.5314: Use in-process recycling whenever possible | $107,610 | $75,000 | - | - |
$760
-
MMBtu
|
$16,690
-
lb
|
- | $90,160 | - | |
08 | 3.5314: Use in-process recycling whenever possible | $39,460 | $10,000 | - | - | - |
$39,460
-
lb
|
- | - | - | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $587,500 | $262,500 | - | - |
$3,500
-
MMBtu
|
- | - | $584,000 | - | |
10 | 3.4114: Replace city water with recycled water via cooling tower | $10,300 | $26,000 | - |
$(-380.0)
-
kW-mo/yr
|
- | - | $10,580 | - |
$100
-
Tgal
|
|
TOTAL RECOMMENDED | $842,760 | $393,230 |
$10,020
454,572
kWh
|
$12,570
-
kW-mo/yr
|
$80,480
-
MMBtu
|
$56,150
-
lb
|
$9,280 | $674,160 |
$100
-
Tgal
|
||
TOTAL IMPLEMENTED | $244,960 | $104,730 |
$10,020
454,572
kWh
|
$12,950
-
kW-mo/yr
|
$76,980
-
MMBtu
|
$56,150
-
lb
|
$(-1,300.0) | $90,160 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs