Assessment Year | 2000 |
---|---|
Principal Product | analytical instruments |
NAICS |
n/a
|
SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
75,000
ft2
|
Annual Production | 330
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,866 | 2,282,825 |
kWh
|
$0.018 |
Electricity Demand | $73,351 | 4,972 |
kW-mo/yr
|
$14.75 |
Electricity Fees | $1,727 | - |
|
- |
Natural Gas | $2,418 | 478 |
MMBtu
|
$5.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,180 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,300 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $4,420 | $10,000 | - |
$4,420
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $2,120 | - |
$440
24,619
kWh
|
$1,680
-
kW-mo/yr
|
- | - | - | - | - | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $540 | $870 |
$130
7,034
kWh
|
$530
-
kW-mo/yr
|
$(-120.0)
-
MMBtu
|
- | - | - | - | - | |
04 | 2.7135: Install occupancy sensors | $470 | $1,000 |
$90
4,982
kWh
|
$380
-
kW-mo/yr
|
- | - | - | - | - | - | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $220 | $280 |
$40
2,638
kWh
|
$180
-
kW-mo/yr
|
- | - | - | - | - | - | |
06 | 3.6192: Use a less expensive method of waste removal | $640 | - | - | - | - | - |
$670
-
lb
|
- | $(-30.0) | - | |
07 | 3.4151: Minimize water usage | $1,030 | $320 | - | - | - |
$550
-
Tgal
|
- | $(-440.0) | - |
$920
-
Tgal
|
|
08 | 4.122: Develop standard procedures to improve internal yields | $50,740 | $40,000 | - | - | - | - | - | $29,740 | $21,000 | - | |
TOTAL RECOMMENDED | $60,180 | $52,470 |
$700
39,273
kWh
|
$7,190
-
kW-mo/yr
|
$(-120.0)
-
MMBtu
|
$550
-
Tgal
|
$670
-
lb
|
$29,300 | $20,970 |
$920
-
Tgal
|
||
TOTAL IMPLEMENTED | $57,300 | $51,320 |
$90
4,982
kWh
|
$4,800
-
kW-mo/yr
|
- |
$550
-
Tgal
|
$670
-
lb
|
$29,300 | $20,970 |
$920
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs