Assessment Year | 2000 |
---|---|
Principal Product | custom architectural woodwork |
NAICS |
n/a
|
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
45,120
ft2
|
Annual Production | 40
pieces
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $16,768 | 1,021,102 |
kWh
|
$0.016 |
Electricity Demand | $39,010 | 2,400 |
kW-mo/yr
|
$16.25 |
Electricity Fees | $492 | - |
|
- |
Natural Gas | $9,068 | 1,967 |
MMBtu
|
$4.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $3,900 | $2,500 | - |
$3,900
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $2,130 | $2,250 | - | - |
$2,130
-
MMBtu
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,000 | $390 |
$480
29,308
kWh
|
$1,520
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $520 | $750 |
$70
4,103
kWh
|
- |
$450
-
MMBtu
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20 | - |
$90
5,569
kWh
|
$260
-
kW-mo/yr
|
- | - | $(-110.0) | $(-220.0) | |
06 | 3.6125: Sell combustible waste | $330 | - | - | - | - |
$330
-
lb
|
- | - | |
TOTAL RECOMMENDED | $8,900 | $5,890 |
$640
38,980
kWh
|
$5,680
-
kW-mo/yr
|
$2,580
-
MMBtu
|
$330
-
lb
|
$(-110.0) | $(-220.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs