ITAC Assessment: CO0461
ITAC logo
ITAC Assessment: CO0461
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product custom architectural woodwork
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 45,120
ft2
Annual Production 40
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,768 1,021,102
kWh
Electricity Demand $39,010 2,400
kW-mo/yr
Electricity Fees $492 -
Natural Gas $9,068 1,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $3,900 $2,500 - $3,900
-
kW-mo/yr
- - - -
02 2.2437: Recover waste heat from equipment $2,130 $2,250 - - $2,130
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,000 $390 $480
29,308
kWh
$1,520
-
kW-mo/yr
- - - -
04 2.7224: Reduce space conditioning during non-working hours $520 $750 $70
4,103
kWh
- $450
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $20 - $90
5,569
kWh
$260
-
kW-mo/yr
- - $(-110.0) $(-220.0)
06 3.6125: Sell combustible waste $330 - - - - $330
-
lb
- -
TOTAL RECOMMENDED $8,900 $5,890 $640
38,980
kWh
$5,680
-
kW-mo/yr
$2,580
-
MMBtu
$330
-
lb
$(-110.0) $(-220.0)
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs