ITAC Assessment: CO0460
ITAC logo
ITAC Assessment: CO0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product glass apparatus
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 33
Plant Area 19,400
ft2
Annual Production 6,600
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,547 908,851
kWh
Electricity Demand $27,424 7,023
kW-mo/yr
Electricity Fees $693 -
Natural Gas $6,991 1,657
MMBtu
Other Gas $112,668 1,702
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $244,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $242,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.3191: Use demand controller or load shedder $2,940 $7,500 - $2,940
-
kW-mo/yr
- - - - -
02 2.4239: Eliminate or reduce compressed air usage $540 $250 $410
12,309
kWh
$130
-
kW-mo/yr
- - - - -
03 2.7224: Reduce space conditioning during non-working hours $530 $750 $140
5,862
kWh
- $390
-
MMBtu
- - - -
04 2.4239: Eliminate or reduce compressed air usage $430 $670 $230
7,034
kWh
$200
-
kW-mo/yr
- - - - -
05 2.2437: Recover waste heat from equipment $240 $600 - - $240
-
MMBtu
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $200 $210 $750
22,274
kWh
$230
-
kW-mo/yr
- - $(-780.0) - -
07 3.6192: Use a less expensive method of waste removal $200 - - - - $220
-
lb
- $(-20.0) -
08 4.131: Modify process to reduce material use/cost $166,400 $40,000 - - - - $166,400 - -
09 4.111: Add equipment/ operators to reduce production bottleneck $72,730 $122,000 - - - - - - $72,730
TOTAL RECOMMENDED $244,210 $171,980 $1,530
47,479
kWh
$3,500
-
kW-mo/yr
$630
-
MMBtu
$220
-
lb
$165,620 $(-20.0) $72,730
TOTAL IMPLEMENTED $242,940 $170,980 $980
29,308
kWh
$3,370
-
kW-mo/yr
$240
-
MMBtu
- $165,620 - $72,730
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs