ITAC Assessment: CO0459
ITAC logo
ITAC Assessment: CO0459
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product fuser rollers and parts
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 52,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 8,112
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,748 4,611,665
kWh
Electricity Demand $73,431 18,213
kW-mo/yr
Electricity Fees $4,380 -
Natural Gas $12,615 3,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.6218: Turn off equipment when not in use $7,950 $660 $7,950
355,217
kWh
- - - - - - -
02 2.3191: Use demand controller or load shedder $6,550 $7,500 - $6,550
-
kW-mo/yr
- - - - - -
03 2.3212: Optimize plant power factor $6,420 $15,880 - $6,420
-
kW-mo/yr
- - - - - -
04 2.4239: Eliminate or reduce compressed air usage $3,670 $1,130 $2,530
78,839
kWh
$1,140
-
kW-mo/yr
- - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,650 $2,070 $2,530
82,356
kWh
$900
-
kW-mo/yr
- - - $(-780.0) - -
06 2.7135: Install occupancy sensors $440 $560 $340
10,551
kWh
$100
-
kW-mo/yr
- - - - - -
07 2.2511: Insulate bare equipment $350 $80 $270
8,206
kWh
$80
-
kW-mo/yr
- - - - - -
08 3.4114: Replace city water with recycled water via cooling tower $3,070 $9,130 $(-120.0)
(-3,810)
kWh
$(-40.0)
-
kW-mo/yr
$1,040
-
Tgal
- - - - $2,190
-
Tgal
09 3.3122: Use filtration, centrifuging to remove contaminants $2,980 - - - - $(-500.0)
-
gal
- $360 $3,120 -
10 3.6192: Use a less expensive method of waste removal $600 - - - - - $650
-
lb
- $(-50.0) -
TOTAL RECOMMENDED $34,680 $37,010 $13,500
531,359
kWh
$15,150
-
kW-mo/yr
$1,040
-
Tgal
$(-500.0)
-
gal
$650
-
lb
$(-420.0) $3,070 $2,190
-
Tgal
TOTAL IMPLEMENTED $9,670 $17,950 $2,530
82,356
kWh
$7,320
-
kW-mo/yr
- - $650
-
lb
$(-780.0) $(-50.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs