Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product custom protective foam packaging
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 60,000
ft2
Annual Production 2,340,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,010 2,837,046
kWh
Electricity Demand $54,744 12,307
kW-mo/yr
Electricity Fees $5,271 -
Natural Gas $224,531 55,614
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $462,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.3212: Optimize plant power factor $5,620 $15,400 n/a - $5,620
-
kW-mo/yr
- - - - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,920 $470 n/a $4,110
106,975
kWh
$1,590
-
kW-mo/yr
- - - $(-780.0) - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,910 $4,030 n/a $630
16,413
kWh
$1,280
-
kW-mo/yr
- - - - - - -
04 2.1213: Direct warmest air to combustion intake $930 $1,400 n/a - - $930
-
MMBtu
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $320 - n/a $470
12,309
kWh
$180
-
kW-mo/yr
- - - - - $(-330.0) -
06 3.5314: Use in-process recycling whenever possible $407,670 $10,000 n/a $(-7,160.0)
(-186,694)
kWh
$(-2,770.0)
-
kW-mo/yr
- $105,600
-
lb
- - - $312,000 -
07 3.6192: Use a less expensive method of waste removal $130 - n/a - - - - $140
-
lb
- - $(-10.0) -
08 4.621: Use fixtures to reduce machine changeout times $31,200 $25,000 n/a - - - - - - - - $31,200
09 2.8121: Apply for tax-free status for energy purchases $9,850 $250 n/a - - - - - - $9,850 - -
TOTAL RECOMMENDED $462,550 $56,550 $(-1,950.0)
(-50,997)
kWh
$5,900
-
kW-mo/yr
$930
-
MMBtu
$105,600
-
lb
$140
-
lb
$(-780.0) $9,850 $311,660 $31,200
TOTAL IMPLEMENTED - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs