ITAC Assessment: CO0454
ITAC logo
ITAC Assessment: CO0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product ice cream
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area 48,000
ft2
Annual Production 5,100,000
Tgal
Production Hrs. Annual 4,680
hrs
Location (State) New Mexico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $235,078 5,444,900
kWh
Electricity Demand $74,159 12,000
kW-mo/yr
Electricity Fees $74,159 -
Natural Gas $21,350 5,999
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,452

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.3134: Shift from daytime to nighttime operation $8,180 - - $3,460
-
kW-mo/yr
$4,720 - - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,460 $7,500 - $3,460
-
kW-mo/yr
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,630 $80 $1,380
34,877
kWh
$1,030
-
kW-mo/yr
- - $(-780.0) - -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,010 - $510
10,258
kWh
$500
-
kW-mo/yr
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $610 $30 $350
8,792
kWh
$260
-
kW-mo/yr
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $392 - $683
17,292
kWh
$291
-
kW-mo/yr
- - - $(-582.0) -
07 3.4151: Minimize water usage $1,480 $640 - - - $680
-
MMBtu
- - $800
-
Tgal
08 3.4154: Eliminate leaks in water lines and valves $350 $490 - - - $160
-
MMBtu
- - $190
-
Tgal
TOTAL RECOMMENDED $17,112 $8,740 $2,923
71,219
kWh
$9,001
-
kW-mo/yr
$4,720 $840
-
MMBtu
$(-780.0) $(-582.0) $990
-
Tgal
TOTAL IMPLEMENTED $7,452 $8,100 $2,923
71,219
kWh
$5,541
-
kW-mo/yr
- $160
-
MMBtu
$(-780.0) $(-582.0) $190
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs