Assessment Year | 1999 |
---|---|
Principal Product | injection molded plastic parts |
NAICS |
n/a
|
SIC | 3079: |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
39,714
ft2
|
Annual Production | 5,250,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,378 | 3,854,924 |
kWh
|
$0.015 |
Electricity Demand | $122,888 | 11,582 |
kW-mo/yr
|
$10.61 |
Natural Gas | $21,934 | 5,057 |
MMBtu
|
$4.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,810 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,780 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,410 | $66,360 |
$7,340
493,552
kWh
|
$10,070
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,830 | $10,000 | - |
$9,830
-
kW-mo/yr
|
- | - | - | - | - | - | |
03 | 2.8113: Purchase gas directly from a contract gas supplier | $3,030 | $500 | - | - | - | - | - | $3,030 | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $700 | $280 |
$620
41,911
kWh
|
$860
-
kW-mo/yr
|
- | - | $(-780.0) | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $60 | - |
$100
6,448
kWh
|
$130
-
kW-mo/yr
|
- | - | - | - | $(-170.0) | - | |
06 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $18,110 | $3,600 | - | - | - | - | - | - | $18,110 | - | |
07 | 3.8113: Prevent excessive solvent usage (operator training) | $2,550 | $1,100 | - | - | - |
$960
-
gal
|
- | - | $1,590 | - | |
08 | 3.3131: Use evaporation to concentrate material | $1,160 | $3,300 |
$(-50.0)
(-3,224)
kWh
|
- |
$1,210
-
gal
|
- | - | - | - | - | |
09 | 4.123: Reduce defects by reducing product tipping | $8,960 | $620 | - | - | - | - | - | - | - | $8,960 | |
TOTAL RECOMMENDED | $61,810 | $85,760 |
$8,010
538,687
kWh
|
$20,890
-
kW-mo/yr
|
$1,210
-
gal
|
$960
-
gal
|
$(-780.0) | $3,030 | $19,530 | $8,960 | ||
TOTAL IMPLEMENTED | $58,780 | $85,260 |
$8,010
538,687
kWh
|
$20,890
-
kW-mo/yr
|
$1,210
-
gal
|
$960
-
gal
|
$(-780.0) | - | $19,530 | $8,960 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs