ITAC Assessment: CO0446
ITAC logo
ITAC Assessment: CO0446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product baked and par-baked breads
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 28,600
ft2
Annual Production 12,500,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,713 1,803,927
kWh
Electricity Demand $27,907 3,564
kW-mo/yr
Electricity Fees $1,020 -
Natural Gas $61,989 12,547
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $858,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,020

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $16,050 $60,000 - $10,620
-
kW-mo/yr
$660 - $(-15,320.0)
-
MMBtu
- - $20,090 - -
02 2.2621: Modify refrigeration system to operate at a lower pressure $1,500 $9,500 $1,090
38,101
kWh
$410
-
kW-mo/yr
- - - - - - - -
03 2.7224: Reduce space conditioning during non-working hours $400 $1,000 $70
2,638
kWh
- - $330
-
MMBtu
- - - - - -
04 2.6218: Turn off equipment when not in use $350 $110 - - - $350
-
MMBtu
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $90 - $2,230
77,960
kWh
$1,070
-
kW-mo/yr
- - - - $(-930.0) - $(-2,280.0) -
06 3.6192: Use a less expensive method of waste removal $530 - - - - - - $570
-
lb
- - $(-40.0) -
07 4.441: Install automatic packing equipment $839,300 $1,020,000 - - - - - - $508,600 - - $330,700
TOTAL RECOMMENDED $858,220 $1,090,610 $3,390
118,699
kWh
$12,100
-
kW-mo/yr
$660 $680
-
MMBtu
$(-15,320.0)
-
MMBtu
$570
-
lb
$507,670 $20,090 $(-2,320.0) $330,700
TOTAL IMPLEMENTED $1,020 $1,000 $2,300
80,598
kWh
$1,070
-
kW-mo/yr
- $330
-
MMBtu
- $570
-
lb
$(-930.0) - $(-2,320.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs