Assessment Year | 1999 |
---|---|
Principal Product | injection molded plastic parts |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 53 |
Plant Area |
17,400
ft2
|
Annual Production | 3,500,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $15,000 | 897,421 |
kWh
|
$0.017 |
Electricity Demand | $29,785 | 3,858 |
kW-mo/yr
|
$7.72 |
Electricity Fees | $660 | - |
|
- |
Natural Gas | $3,987 | 876 |
MMBtu
|
$4.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,270 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,270 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,870 | $14,850 |
$1,950
118,992
kWh
|
$2,920
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,380 | $2,000 | - |
$1,380
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $570 | $710 |
$80
4,982
kWh
|
$580
-
kW-mo/yr
|
$(-90.0)
-
MMBtu
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $370 | $500 |
$160
9,672
kWh
|
$210
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7224: Reduce space conditioning during non-working hours | $310 | $100 | - | - |
$310
-
MMBtu
|
- | - | - | |
06 | 3.6192: Use a less expensive method of waste removal | $210 | $134 | - | - | - |
$280
-
lb
|
$(-70.0) | - | |
07 | 4.454: Modify startup/shutdown times | $10,920 | - | - | - | - | - | - | $10,920 | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $3,640 | $8,000 | - | - | - | - | - | $3,640 | |
TOTAL RECOMMENDED | $22,270 | $26,294 |
$2,190
133,646
kWh
|
$5,090
-
kW-mo/yr
|
$220
-
MMBtu
|
$280
-
lb
|
$(-70.0) | $14,560 | ||
TOTAL IMPLEMENTED | $2,270 | $2,734 |
$160
9,672
kWh
|
$1,590
-
kW-mo/yr
|
$310
-
MMBtu
|
$280
-
lb
|
$(-70.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs