ITAC Assessment: CO0429
ITAC logo
ITAC Assessment: CO0429
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product finished metal components
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 11,250
ft2
Annual Production 8,850
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,336 889,801
kWh
Electricity Demand $41,319 2,931
kW-mo/yr
Electricity Fees $590 -
Natural Gas $10,953 2,346
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $840 $1,000 $840
-
kW-mo/yr
- - - -
02 3.2161: Closely monitor chemical additions to increase bath life $4,860 - - $2,050
-
gal
$60 $2,750 -
03 3.1242: Allow drainage before withdrawing object $2,930 $800 - - $320 $2,610 -
04 4.431: Train operators for maximum operating efficiency $6,000 $10,160 - - - - $6,000
05 4.514: Re-arrange equipment layout to reduce handling costs $730 $280 - - - - $730
TOTAL RECOMMENDED $15,360 $12,240 $840
-
kW-mo/yr
$2,050
-
gal
$380 $5,360 $6,730
TOTAL IMPLEMENTED $11,700 $11,160 $840
-
kW-mo/yr
$2,050
-
gal
$60 $2,750 $6,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs