ITAC Assessment: AM0619
ITAC logo
ITAC Assessment: AM0619
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Bricks
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3251: Brick and Structural Clay Tile
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 100,000
ft2
Annual Production 125,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $633,695 11,266,950
kWh
Electricity Demand $134,694 31,128
kW-mo/yr
Electricity Fees $2,148 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,450 $58,400 $14,750
295,000
kWh
$3,700
-
kW-mo/yr
- - -
02 2.7124: Make a practice of turning off lights when not needed $7,470 - $6,550
131,000
kWh
$920
-
kW-mo/yr
- - -
03 2.4314: Use synthetic lubricant $2,900 - $2,335
46,700
kWh
$565
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,410 $60 $1,080
21,700
kWh
$330
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,105 $512 $155
3,130
kWh
$15
-
kW-mo/yr
$935 - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,055 $500 $780
15,600
kWh
$275
-
kW-mo/yr
- - -
07 2.8123: Pay utility bills on time $402 - - - - $402 -
08 3.5248: Separate and recycle scrap metal to foundry or for sale $337 - - - - - $337
TOTAL RECOMMENDED $33,129 $59,472 $25,650
513,130
kWh
$5,805
-
kW-mo/yr
$935 $402 $337
TOTAL IMPLEMENTED $27,714 $58,900 $22,080
441,600
kWh
$4,895
-
kW-mo/yr
- $402 $337
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs