ITAC Assessment: CO0421
ITAC logo
ITAC Assessment: CO0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product commercial printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 40,000
ft2
Annual Production 34,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,812 1,065,944
kWh
Electricity Demand $39,631 2,742
kW-mo/yr
Electricity Fees $216 -
Natural Gas $11,285 2,365
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,932 $6,811 $710
37,515
kWh
$1,222
-
kW-mo/yr
- - - - -
02 2.3191: Use demand controller or load shedder $910 $2,500 - $910
-
kW-mo/yr
- - - - -
03 3.8133: Convert to aqueous cleaning $11,718 $1,500 - $60
-
kW-mo/yr
- $7,548
-
lb
- $4,110 -
04 3.8132: Use less toxic and volatile solvent substitutes $2,040 - - - $700
-
gal
- - $1,340 -
05 3.8132: Use less toxic and volatile solvent substitutes $1,380 - - - - - $1,380
-
lb
- -
06 4.122: Develop standard procedures to improve internal yields $37,620 $15,460 - - - - - - $37,620
TOTAL RECOMMENDED $55,600 $26,271 $710
37,515
kWh
$2,192
-
kW-mo/yr
$700
-
gal
$7,548
-
lb
$1,380
-
lb
$5,450 $37,620
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Ancillary Material Cost Savings Primary Product Savings