ITAC Assessment: CO0402
ITAC logo
ITAC Assessment: CO0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product wood display cabinets & fixtures
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 80,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 5,720
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,184 1,103,458
kWh
Electricity Demand $46,747 3,494
kW-mo/yr
Electricity Fees $216 -
Natural Gas $12,176 3,375
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $635 $995 $147
8,499
kWh
$488
-
kW-mo/yr
- - - -
02 2.6212: Turn off equipment during breaks, reduce operating time $1,200 $2,920 $1,200
69,461
kWh
- - - - -
03 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner $1,180 $1,000 - - - $910 $270 -
04 3.8132: Use less toxic and volatile solvent substitutes $930 - - - $760
-
lb
- $170 -
05 3.8132: Use less toxic and volatile solvent substitutes $970 - - - - - $970 -
06 3.6192: Use a less expensive method of waste removal $360 - - - $360
-
lb
- - -
07 4.451: Add additional production shift $35,580 $730 $(-190.0)
(-10,844)
kWh
- - $(-2,990.0) - $38,760
08 4.514: Re-arrange equipment layout to reduce handling costs $8,970 $20,000 - - - $8,970 - -
TOTAL RECOMMENDED $49,825 $25,645 $1,157
67,116
kWh
$488
-
kW-mo/yr
$1,120
-
lb
$6,890 $1,410 $38,760
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings