ITAC Assessment: CO0394
ITAC logo
ITAC Assessment: CO0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product aerospace hardware
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 254,000
ft2
Annual Production 2,400,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $292,603 14,497,949
kWh
Electricity Demand $328,584 49,179
kW-mo/yr
Electricity Fees $1,995 -
Natural Gas $95,604 28,639
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $360,302 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $382 $687 $175
10,551
kWh
$207
-
kW-mo/yr
- - - - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,530 $3,940 $700
42,497
kWh
$830
-
kW-mo/yr
- - - - - -
03 3.1191: Change procedures / equipment / operating conditions $8,760 $10,000 - - $2,813
-
gal
$2,917
-
gal
- $300 $2,730 -
04 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $6,360 $22,200 - - - - - - $6,360 -
05 3.8142: Distill contaminated solvents for reuse $5,740 $5,680 - $(-120.0)
-
kW-mo/yr
- $3,440
-
gal
- $(-4,400.0) $6,820 -
06 3.6112: Use filter and drying oven to reduce sludge volume $6,000 $23,500 $(-620.0)
(-37,515)
kWh
$1,050
-
kW-mo/yr
- - $5,570
-
lb
- - -
07 3.6192: Use a less expensive method of waste removal $1,530 - - - - - $1,530
-
lb
- - -
08 4.111: Add equipment/ operators to reduce production bottleneck $330,000 - - - - - - $(-120,000.0) - $450,000
TOTAL RECOMMENDED $360,302 $66,007 $255
15,533
kWh
$1,967
-
kW-mo/yr
$2,813
-
gal
$6,357
-
gal
$7,100
-
lb
$(-124,100.0) $15,910 $450,000
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs