ITAC Assessment: CO0370
ITAC logo
ITAC Assessment: CO0370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product plumbing fixtures
NAICS
n/a
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 6,656
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,995 1,515,533
kWh
Electricity Fees $183 -
Natural Gas $21,047 5,659
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $975

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $29,710 $500 - - $29,710 -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,770 $23,300 $7,770
157,093
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $319 $623 $319
6,448
kWh
- - -
04 2.4133: Use most efficient type of electric motors $156 $217 $156
3,224
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $500 $60 $500
9,965
kWh
- - -
06 3.8132: Use less toxic and volatile solvent substitutes $390 $1,370 - $700
-
gal
- $(-310.0)
TOTAL RECOMMENDED $38,845 $26,070 $8,745
176,730
kWh
$700
-
gal
$29,710 $(-310.0)
TOTAL IMPLEMENTED $975 $900 $975
19,637
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs