Assessment Year | 1996 |
---|---|
Principal Product | plumbing fixtures |
NAICS |
n/a
|
SIC | 3432: Plumbing Fixture Fittings and Trim |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
50,000
ft2
|
Annual Production | 800,000
pieces
|
Production Hrs. Annual | 6,656
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $74,995 | 1,515,533 |
kWh
|
$0.049 |
Electricity Fees | $183 | - |
|
- |
Natural Gas | $21,047 | 5,659 |
MMBtu
|
$3.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,845 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $975 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $29,710 | $500 | - | - | $29,710 | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,770 | $23,300 |
$7,770
157,093
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $319 | $623 |
$319
6,448
kWh
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $156 | $217 |
$156
3,224
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $500 | $60 |
$500
9,965
kWh
|
- | - | - | |
06 | 3.8132: Use less toxic and volatile solvent substitutes | $390 | $1,370 | - |
$700
-
gal
|
- | $(-310.0) | |
TOTAL RECOMMENDED | $38,845 | $26,070 |
$8,745
176,730
kWh
|
$700
-
gal
|
$29,710 | $(-310.0) | ||
TOTAL IMPLEMENTED | $975 | $900 |
$975
19,637
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs