ITAC Assessment: CO0363
ITAC logo
ITAC Assessment: CO0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product refurbished folding carton machinery
NAICS
n/a
SIC 3554: Paper Industries Machinery
Sales Range $1
M
to 5
M
# of Employees 80
Plant Area 32,000
ft2
Annual Production 72,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,064 598,769
kWh
Electricity Demand $15,784 1,570
kW-mo/yr
Electricity Fees $(-459.0) -
Natural Gas $6,056 1,728
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $859

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $21,800 $14,040 $3,080
96,717
kWh
- - - - $18,720
02 3.8132: Use less toxic and volatile solvent substitutes $4,360 $1,560 - - $4,800
-
gal
- $(-440.0) -
03 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner $2,730 $1,350 - - - $1,300 $1,430 -
04 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $2,310 $11,720 - - $250
-
gal
- $2,060 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $554 $2,458 $263
8,206
kWh
$291
-
kW-mo/yr
- - - -
06 2.4133: Use most efficient type of electric motors $85 $83 $61
2,052
kWh
$24
-
kW-mo/yr
- - - -
07 2.4221: Install compressor air intakes in coolest locations $220 $180 $140
4,396
kWh
$80
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $32,059 $31,391 $3,544
111,371
kWh
$395
-
kW-mo/yr
$5,050
-
gal
$1,300 $3,050 $18,720
TOTAL IMPLEMENTED $859 $2,721 $464
14,654
kWh
$395
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs