ITAC Assessment: CO0362
ITAC logo
ITAC Assessment: CO0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product ski lift systems
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 32,000
ft2
Annual Production 15
pieces
Production Hrs. Annual 3,003
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,710 570,926
kWh
Electricity Demand $26,729 2,660
kW-mo/yr
Electricity Fees $(-228.0) -
Natural Gas $5,413 1,525
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,000 $1,950 - - - - - $4,000
02 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner $2,260 $1,000 - - - $150
-
gal
$760 $1,350
03 3.8132: Use less toxic and volatile solvent substitutes $1,070 $1,400 - - - $1,380
-
gal
- $(-310.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $125 $188 $55
1,465
kWh
$70
-
kW-mo/yr
- - - -
05 2.2437: Recover waste heat from equipment $380 $650 - - $380
-
MMBtu
- - -
TOTAL RECOMMENDED $7,835 $5,188 $55
1,465
kWh
$70
-
kW-mo/yr
$380
-
MMBtu
$1,530
-
gal
$760 $5,040
TOTAL IMPLEMENTED $380 $650 - - $380
-
MMBtu
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs