Assessment Year | 1996 |
---|---|
Principal Product | ski lift systems |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
32,000
ft2
|
Annual Production | 15
pieces
|
Production Hrs. Annual | 3,003
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $19,710 | 570,926 |
kWh
|
$0.035 |
Electricity Demand | $26,729 | 2,660 |
kW-mo/yr
|
$10.05 |
Electricity Fees | $(-228.0) | - |
|
- |
Natural Gas | $5,413 | 1,525 |
MMBtu
|
$3.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,835 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $380 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $4,000 | $1,950 | - | - | - | - | - | $4,000 | |
02 | 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner | $2,260 | $1,000 | - | - | - |
$150
-
gal
|
$760 | $1,350 | |
03 | 3.8132: Use less toxic and volatile solvent substitutes | $1,070 | $1,400 | - | - | - |
$1,380
-
gal
|
- | $(-310.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $125 | $188 |
$55
1,465
kWh
|
$70
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $380 | $650 | - | - |
$380
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $7,835 | $5,188 |
$55
1,465
kWh
|
$70
-
kW-mo/yr
|
$380
-
MMBtu
|
$1,530
-
gal
|
$760 | $5,040 | ||
TOTAL IMPLEMENTED | $380 | $650 | - | - |
$380
-
MMBtu
|
- | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs