ITAC Assessment: CO0358
ITAC logo
ITAC Assessment: CO0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product agricultural equipment
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 238,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,062 1,166,471
kWh
Electricity Demand $18,559 2,830
kW-mo/yr
Natural Gas $12,428 2,582
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,072

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,490 $12,750 $7,060
174,678
kWh
$5,060
-
kW-mo/yr
$(-4,630.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,072 $2,338 $1,714
42,497
kWh
$1,358
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $240 $300 - - $240
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $220 $520 $160
3,810
kWh
$60
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $37 $137 $22
879
kWh
$15
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $190 $60 $140
3,517
kWh
$50
-
kW-mo/yr
- -
07 3.8132: Use less toxic and volatile solvent substitutes $(-200.0) $260 - - - $(-200.0)
TOTAL RECOMMENDED $11,049 $16,365 $9,096
225,381
kWh
$6,543
-
kW-mo/yr
$(-4,390.0)
-
MMBtu
$(-200.0)
TOTAL IMPLEMENTED $3,072 $2,338 $1,714
42,497
kWh
$1,358
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs