ITAC Assessment: CO0357
ITAC logo
ITAC Assessment: CO0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product tortillas and tortilla chips
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 40,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 4,992
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,860 3,418,523
kWh
Electricity Demand $65,856 8,167
kW-mo/yr
Electricity Fees $1,122 -
Natural Gas $163,720 62,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $12,590 - - - - $12,590
-
lb
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,926 $10,204 $3,467
134,818
kWh
$1,459
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,700 $50 $1,190
46,307
kWh
$510
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $183 $377 $96
3,810
kWh
$87
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $960 $20 $670
26,084
kWh
$290
-
kW-mo/yr
- -
06 3.8132: Use less toxic and volatile solvent substitutes $870 $1,400 - - $870
-
gal
-
TOTAL RECOMMENDED $21,229 $12,051 $5,423
211,019
kWh
$2,346
-
kW-mo/yr
$870
-
gal
$12,590
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs