ITAC Assessment: CO0322
ITAC logo
ITAC Assessment: CO0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Asphalt
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 12
Plant Area 2,500
ft2
Annual Production 520,000
ton
Production Hrs. Annual 2,040
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,890 3,475,967
kWh
Natural Gas $437,480 98,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $224,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $131,920 $35,180 $131,920
1,630,422
kWh
-
02 2.2414: Use waste heat from hot flue gases to preheat $58,530 $85,020 - $58,530
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $12,530 $830 $12,530
155,627
kWh
-
04 2.2511: Insulate bare equipment $12,270 $16,040 - $12,270
-
MMBtu
05 2.4133: Use most efficient type of electric motors $5,570 $19,930 $5,570
69,168
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,320 $500 $2,320
28,722
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,650 $7,690 $1,650
20,516
kWh
-
TOTAL RECOMMENDED $224,790 $165,190 $153,990
1,904,455
kWh
$70,800
-
MMBtu
TOTAL IMPLEMENTED $20,420 $21,260 $20,420
253,517
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs