ITAC Assessment: CO0318
ITAC logo
ITAC Assessment: CO0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product metal water control gates
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 110,000
ft2
Annual Production 4,300,600
lb
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,710 1,450,469
kWh
Natural Gas $33,900 8,648
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings Gaseous Waste Savings
01 3.7214: Reduce or eliminate waste $27,620 $15,000 - - $27,620
-
lb
-
02 2.7243: Improve air circulation with destratification fans / other methods $6,830 $7,860 $(-870.0)
(-13,189)
kWh
$7,700
-
MMBtu
- -
03 2.2437: Recover waste heat from equipment $820 $820 - $820
-
MMBtu
- -
04 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner $2,210 $1,750 - - - $2,210
-
lb
05 2.4133: Use most efficient type of electric motors $1,590 $2,260 $1,590
24,033
kWh
- - -
06 2.7134: Use photocell controls $1,580 $3,000 $1,580
24,033
kWh
- - -
07 3.2124: Convert to air assisted / airless paint guns $1,310 $1,300 - - - $1,310
-
lb
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $880 $370 $880
13,482
kWh
- - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $560 $960 $560
8,499
kWh
- - -
TOTAL RECOMMENDED $43,400 $33,320 $3,740
56,858
kWh
$8,520
-
MMBtu
$27,620
-
lb
$3,520
-
lb
TOTAL IMPLEMENTED $12,070 $13,200 $2,160
32,825
kWh
$7,700
-
MMBtu
- $2,210
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings Gaseous Waste Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs