ITAC Assessment: CO0310
ITAC logo
ITAC Assessment: CO0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product quartz crystals
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 125
Plant Area 22,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,850 1,083,822
kWh
Natural Gas $5,060 1,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings
01 3.5314: Use in-process recycling whenever possible $7,150 - - - - $7,150
-
gal
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $4,900 $3,810 $(-190.0)
(-3,517)
kWh
- $5,090
-
Tgal
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,070 $6,820 $3,070
59,496
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,880 $1,720 $2,880
55,979
kWh
- - - -
05 3.5314: Use in-process recycling whenever possible $1,840 - - - - - $1,840
-
gal
06 2.7314: Reduce ventilation air $850 $550 $470
13,775
kWh
$380
-
MMBtu
- - -
07 2.4133: Use most efficient type of electric motors $440 $730 $440
8,499
kWh
- - - -
08 2.7211: Clean and maintain refrigerant condensers and towers $410 $90 $410
7,913
kWh
- - - -
TOTAL RECOMMENDED $21,540 $13,720 $7,080
142,145
kWh
$380
-
MMBtu
$5,090
-
Tgal
$7,150
-
gal
$1,840
-
gal
TOTAL IMPLEMENTED $6,610 $8,190 $4,390
89,683
kWh
$380
-
MMBtu
- - $1,840
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs