ITAC Assessment: CO0309
ITAC logo
ITAC Assessment: CO0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Asphalt
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 2,400
ft2
Annual Production 2,500,000
ton
Production Hrs. Annual 3,588
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,730 4,807,444
kWh
Natural Gas $370,390 82,309
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $12,900 $5,430 - $12,900
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $2,950 $210 - $2,950
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,810 $300 $2,810
56,272
kWh
-
04 2.4133: Use most efficient type of electric motors $7,810 $24,740 $7,810
157,386
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,650 $8,020 $2,650
53,341
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $430 $850 $430
8,499
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $2,760 $1,800 $2,760
55,686
kWh
-
TOTAL RECOMMENDED $32,310 $41,350 $16,460
331,184
kWh
$15,850
-
MMBtu
TOTAL IMPLEMENTED $13,700 $33,910 $13,700
275,498
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs