ITAC Assessment: CO0283
ITAC logo
ITAC Assessment: CO0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 45,000
ft2
Annual Production 576
thousand feet
Production Hrs. Annual 4,106
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,894 1,577,374
kWh
Natural Gas $18,827 5,158
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,250 $36,500 $20,460
398,886
kWh
$(-6,210.0)
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $2,520 $650 - $2,520
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,910 $1,930 $1,910
37,222
kWh
- -
04 2.4133: Use most efficient type of electric motors $1,200 $2,520 $1,200
23,447
kWh
- -
05 2.8121: Apply for tax-free status for energy purchases $590 $250 - - $590
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $530 $150 $530
10,551
kWh
- -
TOTAL RECOMMENDED $21,000 $42,000 $24,100
470,106
kWh
$(-3,690.0)
-
MMBtu
$590
TOTAL IMPLEMENTED $3,030 $2,330 $2,440
47,773
kWh
- $590
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs