ITAC Assessment: CO0271
ITAC logo
ITAC Assessment: CO0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Assembled Luggage
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 172,617
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $408,691 7,227,433
kWh
Natural Gas $105,187 61,513
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,594

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $34,060 $400 $34,060
1,373,095
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,640 $400 $4,640
82,063
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,260 $2,500 - $2,260
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $3,240 $8,000 $3,240
57,151
kWh
-
05 2.4133: Use most efficient type of electric motors $7,634 $37,430 $7,634
135,111
kWh
-
TOTAL RECOMMENDED $51,834 $48,730 $49,574
1,647,420
kWh
$2,260
-
MMBtu
TOTAL IMPLEMENTED $48,594 $40,730 $46,334
1,590,269
kWh
$2,260
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs