ITAC Assessment: AR0006
ITAC logo
ITAC Assessment: AR0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Hardwood flooring
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $1
M
to 5
M
# of Employees 53
Plant Area 112,000
ft2
Annual Production 2,500,000
thousand feet
Production Hrs. Annual 2,086
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,614 1,827,374
kWh
Wood $10,386 30,279
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.4133: Use most efficient type of electric motors $6,097 $6,300 $6,097
66,823
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $2,349 $408 $2,349
25,791
kWh
-
03 2.2135: Repair and eliminate steam leaks $4,257 $700 - $4,257
-
MMBtu
04 2.3322: Use existing dam to generate electricity $11,401 $2,700 $11,726
132,181
kWh
$(-325.0)
-
MMBtu
05 2.4321: Upgrade obsolete equipment $102,580 $120,000 $102,580
1,156,213
kWh
-
TOTAL RECOMMENDED $126,684 $130,108 $122,752
1,381,008
kWh
$3,932
-
MMBtu
TOTAL IMPLEMENTED $24,104 $10,108 $20,172
224,795
kWh
$3,932
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs