| Assessment Year | 1992 |
|---|---|
| Principal Product | Computer Parts |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 100 |
| Plant Area |
85,000
ft2
|
| Annual Production | 144,500
pieces
|
| Production Hrs. Annual | 4,477
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $79,079 | 1,254,689 |
kWh
|
$0.063 |
| Natural Gas | $8,556 | 2,134 |
MMBtu
|
$4.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,670 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,780 | $30 |
$840
13,482
kWh
|
$940
-
MMBtu
|
- | |
| 02 | 2.8121: Apply for tax-free status for energy purchases | $1,120 | $250 | - | - | $1,120 | |
| 03 | 2.7231: Use radiant heater for spot heating | $530 | $200 | - |
$530
-
MMBtu
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $480 | $100 |
$480
7,620
kWh
|
- | - | |
| 05 | 2.4224: Upgrade controls on compressors | $470 | $300 |
$470
17,878
kWh
|
- | - | |
| 06 | 2.2437: Recover waste heat from equipment | $1,100 | $2,840 | - |
$1,100
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $430 | $220 |
$430
6,741
kWh
|
- | - | |
| 08 | 2.7243: Improve air circulation with destratification fans / other methods | $2,110 | $3,200 |
$(-230.0)
(-3,517)
kWh
|
$2,340
-
MMBtu
|
- | |
| 09 | 2.6212: Turn off equipment during breaks, reduce operating time | $340 | $240 |
$340
12,896
kWh
|
- | - | |
| 10 | 2.2514: Cover open tanks | $370 | $360 |
$370
12,896
kWh
|
- | - | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,520 | $1,060 |
$4,520
71,805
kWh
|
- | - | |
| 12 | 2.7111: Reduce illumination to minimum necessary levels | $3,800 | $4,250 |
$3,800
64,771
kWh
|
- | - | |
| 13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,930 | $27,850 |
$6,930
109,906
kWh
|
- | - | |
| 14 | 2.4133: Use most efficient type of electric motors | $1,690 | $3,100 |
$1,690
26,671
kWh
|
- | - | |
| TOTAL RECOMMENDED | $25,670 | $44,000 |
$19,640
341,149
kWh
|
$4,910
-
MMBtu
|
$1,120 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs