ITAC Assessment: CO0243
ITAC logo
ITAC Assessment: CO0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Fabric. Struc. Steel
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 131,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 4,368
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,064 1,601,700
kWh
Natural Gas $39,462 11,211
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $1,490 $250 $1,490
-
kWh
- -
02 2.1332: Convert combustion equipment to burn natural gas $11,590 $5,500 $(-20.0)
(-293)
kWh
$(-770.0)
-
MMBtu
$12,380
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,100 $230 $1,100
17,585
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $280 $220 $280
5,569
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $230 $590 $230
3,517
kWh
- -
06 2.7243: Improve air circulation with destratification fans / other methods $2,380 $5,600 $(-190.0)
(-2,931)
kWh
$2,570
-
MMBtu
-
07 2.4133: Use most efficient type of electric motors $6,540 $16,210 $6,540
103,751
kWh
- -
08 2.2212: Use minimum safe oven ventilation $260 $680 - $260
-
MMBtu
-
09 2.2511: Insulate bare equipment $610 $3,410 - $610
-
MMBtu
-
TOTAL RECOMMENDED $24,480 $32,690 $9,430
127,198
kWh
$2,670
-
MMBtu
$12,380
-
MMBtu
TOTAL IMPLEMENTED $24,480 $32,690 $9,430
127,198
kWh
$2,670
-
MMBtu
$12,380
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs