| Assessment Year | 1992 |
|---|---|
| Principal Product | Fabric. Struc. Steel |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 110 |
| Plant Area |
131,000
ft2
|
| Annual Production | 13,000,000
lb
|
| Production Hrs. Annual | 4,368
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $101,064 | 1,601,700 |
kWh
|
$0.063 |
| Natural Gas | $39,462 | 11,211 |
MMBtu
|
$3.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,480 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,480 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $1,490 | $250 |
$1,490
-
kWh
|
- | - | |
| 02 | 2.1332: Convert combustion equipment to burn natural gas | $11,590 | $5,500 |
$(-20.0)
(-293)
kWh
|
$(-770.0)
-
MMBtu
|
$12,380
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,100 | $230 |
$1,100
17,585
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $280 | $220 |
$280
5,569
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $230 | $590 |
$230
3,517
kWh
|
- | - | |
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $2,380 | $5,600 |
$(-190.0)
(-2,931)
kWh
|
$2,570
-
MMBtu
|
- | |
| 07 | 2.4133: Use most efficient type of electric motors | $6,540 | $16,210 |
$6,540
103,751
kWh
|
- | - | |
| 08 | 2.2212: Use minimum safe oven ventilation | $260 | $680 | - |
$260
-
MMBtu
|
- | |
| 09 | 2.2511: Insulate bare equipment | $610 | $3,410 | - |
$610
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $24,480 | $32,690 |
$9,430
127,198
kWh
|
$2,670
-
MMBtu
|
$12,380
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,480 | $32,690 |
$9,430
127,198
kWh
|
$2,670
-
MMBtu
|
$12,380
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs