| Assessment Year | 1992 |
|---|---|
| Principal Product | Construction lumber |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $1 M to 5M |
| # of Employees | 65 |
| Plant Area |
50,000
ft2
|
| Annual Production | 40,000
thousand feet
|
| Production Hrs. Annual | 2,166
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $142,179 | 1,849,062 |
kWh
|
$0.077 |
| Other Energy | $418 | 51 |
MMBtu
|
$8.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,070 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,070 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $13,400 | $10,830 | - | - | $13,400 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,330 | $17,600 |
$5,330
69,168
kWh
|
- | - | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,870 | $680 |
$2,870
37,222
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,760 | $500 |
$2,760
35,756
kWh
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $2,730 | $670 |
$2,730
35,463
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,040 | - |
$1,040
13,482
kWh
|
- | - | |
| 07 | 2.7224: Reduce space conditioning during non-working hours | $670 | $125 |
$670
8,792
kWh
|
- | - | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $630 | $2,360 |
$630
8,206
kWh
|
- | - | |
| 09 | 2.7224: Reduce space conditioning during non-working hours | $340 | $150 | - |
$340
-
MMBtu
|
- | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $300 | $290 |
$300
3,810
kWh
|
- | - | |
| TOTAL RECOMMENDED | $30,070 | $33,205 |
$16,330
211,899
kWh
|
$340
-
MMBtu
|
$13,400 | ||
| TOTAL IMPLEMENTED | $30,070 | $33,205 |
$16,330
211,899
kWh
|
$340
-
MMBtu
|
$13,400 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs