Assessment Year | 1992 |
---|---|
Principal Product | Processed Turkey |
NAICS |
n/a
|
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $100 M to 500M |
# of Employees | 850 |
Plant Area |
310,000
ft2
|
Annual Production | 100,000,000
lb
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $914,557 | 25,579,426 |
kWh
|
$0.036 |
Natural Gas | $559,204 | 216,746 |
MMBtu
|
$2.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $106,540 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $106,540 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $4,915 | $250 |
$2,810
-
kWh
|
$2,105
-
MMBtu
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,350 | $4,200 |
$8,350
-
kWh
|
- | |
03 | 3.4154: Eliminate leaks in water lines and valves | $5,050 | $6,000 | - |
$5,050
-
MMBtu
|
|
04 | 2.3137: Use power during off-peak periods | $3,390 | $2,450 | - |
$3,390
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $3,720 | $3,860 | - |
$3,720
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $31,290 | $7,560 |
$31,290
875,147
kWh
|
- | |
07 | 2.7224: Reduce space conditioning during non-working hours | $585 | $750 |
$275
19,930
kWh
|
$310
-
MMBtu
|
|
08 | 2.2437: Recover waste heat from equipment | $30,500 | $60,000 | - |
$30,500
-
MMBtu
|
|
09 | 2.4131: Size electric motors for peak operating efficiency | $18,740 | $57,080 |
$18,740
520,809
kWh
|
- | |
TOTAL RECOMMENDED | $106,540 | $142,150 |
$61,465
1,415,886
kWh
|
$45,075
-
MMBtu
|
||
TOTAL IMPLEMENTED | $106,540 | $142,150 |
$61,465
1,415,886
kWh
|
$45,075
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs