ITAC Assessment: CO0235
ITAC logo
ITAC Assessment: CO0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Processed Turkey
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 850
Plant Area 310,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $914,557 25,579,426
kWh
Natural Gas $559,204 216,746
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $4,915 $250 $2,810
-
kWh
$2,105
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,350 $4,200 $8,350
-
kWh
-
03 3.4154: Eliminate leaks in water lines and valves $5,050 $6,000 - $5,050
-
MMBtu
04 2.3137: Use power during off-peak periods $3,390 $2,450 - $3,390
-
MMBtu
05 2.2511: Insulate bare equipment $3,720 $3,860 - $3,720
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $31,290 $7,560 $31,290
875,147
kWh
-
07 2.7224: Reduce space conditioning during non-working hours $585 $750 $275
19,930
kWh
$310
-
MMBtu
08 2.2437: Recover waste heat from equipment $30,500 $60,000 - $30,500
-
MMBtu
09 2.4131: Size electric motors for peak operating efficiency $18,740 $57,080 $18,740
520,809
kWh
-
TOTAL RECOMMENDED $106,540 $142,150 $61,465
1,415,886
kWh
$45,075
-
MMBtu
TOTAL IMPLEMENTED $106,540 $142,150 $61,465
1,415,886
kWh
$45,075
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs