ITAC Assessment: AS0252
ITAC logo
ITAC Assessment: AS0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Deep Drain Metal Forming
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 52,000
ft2
Annual Production 200,000
ton
Production Hrs. Annual 4,850
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $335,590 5,439,918
kWh
Electricity Demand $45,513 17,000
kW-mo/yr
Electricity Fees $39,853 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,773 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,085

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,350 $16,625 $5,282
93,787
kWh
$1,068
-
kW-mo/yr
- - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,693 $59,800 $26,902
477,433
kWh
$3,826
-
kW-mo/yr
$(-13,035.0)
-
MMBtu
- - -
03 2.4133: Use most efficient type of electric motors $4,590 $12,314 $3,657
64,771
kWh
$933
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,570 $220 $6,570
116,647
kWh
- - - - -
05 3.5217: Reuse / recycle/ sell paper products $515 $80 - - - - $515
-
lb
-
06 3.6192: Use a less expensive method of waste removal $2,018 $80 - - - $2,018
-
gal
- -
07 4.821: Pay bills on time to avoid late fees $12,037 $80 - - - - - $12,037
TOTAL RECOMMENDED $49,773 $89,199 $42,411
752,638
kWh
$5,827
-
kW-mo/yr
$(-13,035.0)
-
MMBtu
$2,018
-
gal
$515
-
lb
$12,037
TOTAL IMPLEMENTED $7,085 $300 $6,570
116,647
kWh
- - - $515
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs