Assessment Year | 1999 |
---|---|
Principal Product | Deep Drain Metal Forming |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
52,000
ft2
|
Annual Production | 200,000
ton
|
Production Hrs. Annual | 4,850
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $335,590 | 5,439,918 |
kWh
|
$0.062 |
Electricity Demand | $45,513 | 17,000 |
kW-mo/yr
|
$2.68 |
Electricity Fees | $39,853 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,773 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,085 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,350 | $16,625 |
$5,282
93,787
kWh
|
$1,068
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $17,693 | $59,800 |
$26,902
477,433
kWh
|
$3,826
-
kW-mo/yr
|
$(-13,035.0)
-
MMBtu
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $4,590 | $12,314 |
$3,657
64,771
kWh
|
$933
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,570 | $220 |
$6,570
116,647
kWh
|
- | - | - | - | - | |
05 | 3.5217: Reuse / recycle/ sell paper products | $515 | $80 | - | - | - | - |
$515
-
lb
|
- | |
06 | 3.6192: Use a less expensive method of waste removal | $2,018 | $80 | - | - | - |
$2,018
-
gal
|
- | - | |
07 | 4.821: Pay bills on time to avoid late fees | $12,037 | $80 | - | - | - | - | - | $12,037 | |
TOTAL RECOMMENDED | $49,773 | $89,199 |
$42,411
752,638
kWh
|
$5,827
-
kW-mo/yr
|
$(-13,035.0)
-
MMBtu
|
$2,018
-
gal
|
$515
-
lb
|
$12,037 | ||
TOTAL IMPLEMENTED | $7,085 | $300 |
$6,570
116,647
kWh
|
- | - | - |
$515
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs