ITAC Assessment: CO0225
ITAC logo
ITAC Assessment: CO0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SILICON RECTIFIERS
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,724 6,286,342
kWh
Natural Gas $24,482 6,794
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,141 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $211 $314 $211
4,103
kWh
- -
02 3.4151: Minimize water usage $3,090 - $680
13,482
kWh
- $2,410
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,220 $5,000 $2,220
43,669
kWh
- -
04 2.2153: Close off unneeded steam lines $880 $3,000 - $880
-
MMBtu
-
05 2.7226: Use computer programs to optimize hvac performance $6,000 $23,600 $6,000
242,087
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $2,740 $11,400 $2,740
53,634
kWh
- -
TOTAL RECOMMENDED $15,141 $43,314 $11,851
356,975
kWh
$880
-
MMBtu
$2,410
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs